Try the live SMPS control model
Simulate an outage, switch Continuity or Optimisation, adjust reserve, and watch decisions update. Illustrative metrics only.
How to use this demonstration
Toggle Continuity or Optimisation, simulate a grid outage, adjust the resilience reserve, and watch operating decisions, power flow, and KPIs update in real time. One simulated day runs in about 72 seconds.
Want a guided walkthrough?
Book time with the team to walk the control model against your site questions, then decide if a pilot is the right next step.